Unitised Curtain Walling
Artistic design freedom of the architect
Today, construction requires faster lead times; construction costs
and failure costs must be reduced, and the number of staff on the
construction site must be kept to a minimum.
The combination of these factors has led to the development of the
EFP 65 Unitised System, a system in which the artistic design freedom
of the architect has almost no limits. An experienced team of techni-
cians is at your service to develop the optimum! Knowing that the EFP
65 Unitised System consists of elements that are manufactured in a
conditioned and controlled environment with the use of specialized
machines and where the elements are glazed, hence the chance of
errors is minimal.
The logistical advantages are also very large; the elements can be
delivered to the construction site in accordance with the Just-In-Time
principle, where they can be installed with a minimum number of
people. This allows a team to install more than 300 m² per day! And
that without using expensive scaffolding and special cranes. The sky
is the limit!